Storm recovery status
Helene and Milton hit hard in 2024. Most of the island is back open, but a few landmarks are still closed or moved. Here's where things stand.
Island status: what's open
Updated Nov 17, 2026- OpenHistoric Bridge Street Pier: Open for strolling and fishing, and it is the ferry landing for the island. source
- OpenGulf Islands Ferry: Running to the Bridge Street Pier, with a Coquina Beach hop. The Anna Maria stop waits on the City Pier. sourcesource 2
- Open56th St and Marina Dr, Holmes Beach: Back open to traffic. Some paving is still to come, so expect short slowdowns. source
- MovedRod & Reel (restaurant): The Rod & Reel reopened on land at 3246 East Bay Dr in Holmes Beach with the old menu. source
- MovedMote Marine at the City Pier: Mote Marine is not returning to the pier. Its old building becomes part of the new PIERadise spot, and the bait shop is coming back. source
- ConstructionAnna Maria City Pier(Before the end of 2026): Closed since the 2024 storms and still under construction. The new walkway is done. In late October crews were running power, plumbing and a new fire sprinkler system in the T end buildings. The city still expects the pier and PIERadise open before the end of 2026. No opening date yet. sourcesource 2source 3
- ConstructionCortez Bridge(First traffic shift late 2026 to early 2027, second mid 2028): The replacement has begun, with pile-driving and force main work along Hunters Point. Expect intermittent daytime and nighttime closures. Construction is usually 7am to 6:30pm, with some night or weekend work. The drawbridge schedule stays in place. Check the official project page for this week's work. sourcesource 2
- ConstructionAll three island bridges(Through late 2026): Crews are adding bike and pedestrian sensors. Expect some overnight lane closures, 7pm to 6am. source
- ClosedLeffis Key Preserve: Closed until further notice because of hurricane damage. source
- DestroyedRod & Reel Pier: The 1947 pier on North Shore Dr was destroyed by Hurricanes Helene and Milton in 2024. The owner has said he plans to rebuild, and that still needs state approval. sourcesource 2
Visiting soon?
- Local tipMost beaches, restaurants and shops are open again. A few spots are still being rebuilt, so check a place's own page before you go.
- Local tipHurricane season runs June 1 to November 30. Consider trip insurance and keep an eye on the forecast.
Sources · checked Nov 17, 2026
- The Islander: Progress at Anna Maria City Pier (Nov 3, 2026)
- AMI Sun: City Pier repairs entering final phase (Sept 16, 2026)
- AMI Sun: City Pier lease awarded to GSM Partners (June 2026)
- The Islander: Rod & Reel rebuild requires additional state approval (Nov 2025)
- Miami Herald: Rod and Reel Pier destroyed by Milton (Oct 10, 2024)
- Manatee County: Leffis Key Preserve
- FDOT District One Roadwatch #46, week of Nov 15-21, 2026
- FDOT: Cortez Bridge project 430204-2
- AMI Sun: The Rod & Reel restaurant sets sail
- City of Bradenton Beach: City Pier
- Gulf Islands Ferry schedule (checked Nov 6, 2026)
- AMI Sun: ferry now includes Coquina Beach (Sept 2026)
- Sarasota/Manatee MPO Traffic Watch, week of Nov 1, 2026
- The Islander RoadWatch, Nov 4, 2026